integration studio scenario is terminated

i have SMAX 24.3 installed on embedded kubernetes. i have configured integration studio scenario to loop on the organizational person groups (from parents to childs and childs of childs) to add some relations there. when the scenario is triggered from a grand parent group it stops processing after some data and never completes the whole tree.

i checked the execution of the scenario and it is terminated due to "recursive trigger count of scenario exceeds the threshold".

this is somethin new in version 24.3 to stop recursion to avoid infinite loops.

i need to know how to change that threshold.