Hello community,
Does someone know if it's possible to sync Jira Description field with ALM Description field when in the source field an image is included.
Usually when a Jira user attach an image in the Description field of an issue, automatically…
When defining Sync Criteria in MF Connect on DateTime-Fields, the following message is used as tooltip for Field Value:
So it seems that there exist some DateTime-dependent keywords.
But in the Documentation of MF Connect I didn't find a list of…
I have a field status which is exactly one value out of a defined list.
Valid Entries in this List are A, B, C, D or E
I want to synchronize all elements with status A, C or E.
Is there any operator in the sync criteria which can be used for that…
We have Defects in MF ALM that should be synchronized to Jira as Observations.
After the initial creation, all changes should be done in the Observation in Jira and updated back in MF ALM, so the synchronization has to be bi-directional.
However…
I want to set sync criteria in a way to only synchronize elements that are linked to one or more other elments.
In this specific example, I would limit the synchronization of TestPlans (out of MF ALM) to only those TestPlans with the Testtype "Functional…
I have a big project in mf alm with many tests, each consisting of several more design steps.
Both types can be synchronized to Jira, works fine.
But not all tests and design steps are necessary in Jira.
So for tests there are lot of fields that…